ISO 9001 and ISO 14001 in 2026: What a Certified South African Site Must Actually Do
By Mthokozisi Nkosi, Food Safety Specialist & Lead Auditor, ASC Food Safety · 13 min read

Update, 23 September 2026. Two things have changed since this article was written on 10 September 2026.
First, ISO 9001:2026 was published on 16 September 2026. It is the sixth edition, it cancels and replaces ISO 9001:2015, and it incorporates Amendment 1:2024. The article below was written while the standard still stood at stage 60.00.
Second, a transition document now exists. Global Accreditation Cooperation, known as Global ACI, which took over the work of the International Accreditation Forum when the IAF ceased operations on 1 January 2026, has published transition requirements for ISO 9001:2026 in document Global ACI-TECH-3-TR. The transition runs three years: certified organisations have until 30 September 2029 to complete it, and from 31 March 2028 new and initial accredited certifications may only be issued to ISO 9001:2026. The statement below that no global transition deadline had been published was correct on 10 September 2026 and is now superseded for ISO 9001.
For the full clause-by-clause position on the published standard, see ISO 9001:2026 versus ISO 9001:2015: every change, clause by clause. Confirm the dates that apply to your own certificate with your certification body.
ISO 14001:2026, edition 4, was published on 15 April 2026 and ISO 14001:2015 is now withdrawn at stage 95.99. A sixth edition of ISO 9001 is scheduled for 16 September 2026 and stood at stage 60.00 when ASC checked on 10 September 2026. No global transition deadline has been published for either standard. Your certificate remains valid.
At a glance
- ISO 14001:2026
- Edition 4, published 15 April 2026
- ISO 14001:2015
- Withdrawn, ISO stage 95.99
- ISO 9001 sixth edition
- Scheduled for publication on 16 September 2026. At stage 60.00, not published, when ASC checked on 10 September 2026
- Global transition deadline
- None from Global ACI as at 10 September 2026. Individual accreditation bodies have set their own dates, so ask your certification body in writing
- Who writes the transition rules now
- Global Accreditation Cooperation (Global ACI), after the International Accreditation Forum ceased operations on 1 January 2026
- SANAS position
- Not verified by ASC and not stated here. Ask SANAS and your certification body
- Your certificate
- Valid. A new edition of a standard does not cancel a certificate issued against the previous one
- Getting the text
- ISO standards are bought from the ISO Store. They are not free downloads, unlike Codex texts
Plan the transition, do not buy a panic project
Nobody can quote you a global transition deadline today, because Global ACI has not published one, although some accreditation bodies have already set their own dates. What ASC can do is read your existing quality, environmental and food safety documentation against the new ISO 14001 text and tell you honestly how much of it moves. Scoped work is quoted as one figure, and hourly advisory starts at R480.
Ask ASC to scope your ISO transition Open the ASC standards register Browse the ASC document toolkits
In this guide
- What is the status of ISO 9001 and ISO 14001 in September 2026?
- What ISO stage 60.00 and stage 95.99 actually mean
- Why the IAF closing on 1 January 2026 changed who writes the transition rules
- Is there an ISO 9001 or ISO 14001 transition deadline? Not a global one
- What SANAS and your certification body decide, and the letter to send them
- What a certified site should actually do this quarter
- Why an integrated management system makes a small ISO change a big project
- The three clauses an ISO transition usually reopens
- What ISO 14001:2026 means for a South African food factory’s legal register
- Does this change ISO 22000, FSSC 22000 or BRCGS?
- Prerequisite programmes: ISO 22002 moved on its own timetable
- How to budget for a transition whose deadline does not exist yet
- Frequently asked questions
What is the status of ISO 9001 and ISO 14001 in September 2026?
Two different situations, often reported as one. ISO 14001:2026, edition 4, was published on 15 April 2026 and ISO 14001:2015 sits at stage 95.99, withdrawn. A sixth edition of ISO 9001 is scheduled for publication on 16 September 2026 and was at stage 60.00, not published, when ASC checked on 10 September 2026.
That distinction matters more than it sounds. One standard exists and can be bought today. The other has a date in the diary. Much of what is circulating online treats both as done, and a louder group treats both as carrying deadlines. Neither claim survives a look at the published record.
| Standard | Position on 10 September 2026 | ISO stage | Date | Transition document | What it means for you |
|---|---|---|---|---|---|
| ISO 14001:2026, edition 4 | Published | Published edition | 15 April 2026 | None published globally | The text exists and can be bought. You can read it and plan against it now. |
| ISO 14001:2015 | Withdrawn by ISO | 95.99 | On publication of edition 4 | None published globally | ISO no longer maintains the edition. Certificates issued against it are unaffected by that fact alone. |
| ISO 9001, sixth edition | Not published | 60.00 | Publication scheduled 16 September 2026 | None published globally | Nothing to buy, read or implement yet. A publication date is not a compliance date. |
| ISO 22000:2018 | Current edition | Confirmed 2023 | Amendment 1:2024 on climate action | Not applicable | Unchanged. Do not let an ISO 9001 conversation drag your food safety standard into it. |
The only column that would justify a project with a deadline attached is the transition document column, and at global level it is empty for both standards. Your own accreditation body is the one that can fill it.
What ISO stage 60.00 and stage 95.99 actually mean
ISO tracks every document through numbered stages, and the two numbers in circulation this month are 60.00 and 95.99. Stage 60.00 is the publication stage, where the text is settled and the document is being prepared for release. Stage 95.99 is withdrawal, the record that ISO no longer maintains or sells that edition because a newer one has replaced it.
Put plainly, 60.00 means almost but not yet. The technical content is fixed, the committee work is finished and the document is in production. It is still not a standard you can buy, quote a clause from, or be audited against. When ISO 9001’s sixth edition moves off 60.00 to published, that is the moment the text becomes real for you, and it is why 16 September 2026 is worth a diary note rather than a project charter.
Stage 95.99 is the one people misread. Withdrawal is an ISO housekeeping act about the catalogue. It says ISO has stopped maintaining ISO 14001:2015. It does not say your certificate has expired, that your auditor may no longer audit against it, or that anything happens to you on a particular date. Certificates live under the accreditation system, not under the ISO catalogue, and the accreditation system has not spoken yet.
If a consultant, a training provider or a certification body salesperson has told you that ISO 14001:2015 being withdrawn puts your certificate at risk, ask them for the document number and the publication date of the transition rule they are relying on. Global ACI had published none as at 10 September 2026, so the only rule that can bind you is one your own accreditation body has issued, and a rule like that has a reference you can check.
Why the IAF closing on 1 January 2026 changed who writes the transition rules
Transition deadlines are not set by ISO. They come from the accreditation system, and that system changed at the start of this year. The International Accreditation Forum ceased operations on 1 January 2026 and its work moved to Global Accreditation Cooperation, known as Global ACI. The body that would normally publish the transition rules is new, and it has not published them for either standard.
For twenty years the pattern was predictable. ISO publishes a revision, the IAF issues a mandatory document setting a transition period, accreditation bodies adopt it, certification bodies write to their clients, and everyone works backwards from a date. That machinery is exactly what changed hands in January. Global ACI has been operating, and it has endorsed FSSC 22000 Version 7, so the successor is functioning. It simply has not issued a transition instrument for ISO 9001 or ISO 14001, and some accreditation bodies have moved ahead of it.
This is the single fact that explains why the internet is noisy on this subject. Commentators are pattern matching to previous transitions and filling the empty space with what usually happens. A transition period will very probably be published. What it says, and from when it runs, is not knowable today, and a plan built on a guessed date has to be rebuilt when the real one lands.
A publication date is not a compliance date, and a withdrawn edition is not a cancelled certificate.
Get an honest read before you commit budget
ASC will read your current ISO 14001 documentation against the 2026 text and give you a written scope of what genuinely changes, separated from what a vendor would like you to buy. If your quality and environmental documents share a home with your food safety system, that read is worth having before any transition quotation reaches your desk.
Ask ASC about an integrated management system ASC management system consulting Context of the Organisation pack, R690
Is there an ISO 9001 or ISO 14001 transition deadline? Not a global one
Not a global one. As at 10 September 2026, when ASC last checked, Global ACI had published no transition document for ISO 9001 or ISO 14001, so no global transition deadline exists. Existing certificates stay valid and run to the expiry printed on them. Surveillance audits continue on their existing schedule against the edition named on your certificate.
I want to be precise about what that sentence does and does not promise. It does not promise that no deadline will ever be published, or that when one arrives it will be generous. It says only that on the date this article was written, the document that would set a global deadline did not exist in public.
Individual accreditation bodies have not all waited for Global ACI. UKAS published a technical bulletin on 22 May 2026 requiring certification bodies to transition all certified customers to ISO 14001:2026 by 30 April 2029, with the certification bodies’ own transition completed by 30 April 2027. If your certificate is issued by a certification body accredited by UKAS, those dates already apply to you even though no global instrument exists. So the only question worth asking is which accreditation body your certification body works under, and what that body has published. Ask in writing.
The reasonable planning posture follows from that. Assume a transition period will come, and assume its length will be set by the accreditation system rather than by ISO. Do not sign a fixed price transition project against a date nobody has published, and do not let a deadline you cannot verify push you into re-writing documentation you would otherwise be improving on your own timetable.
- Your certificate is not at risk today. Nothing published between April and September 2026 changes the validity of a certificate in force.
- No global date can be quoted to you. Global ACI has published no transition instrument for either standard, though your own accreditation body may have.
- ISO withdrawal is not accreditation withdrawal. Stage 95.99 is a catalogue status, not a certification consequence.
- Your certification body is the authority on your dates. Not a blog, not a webinar, and not this article.
- Work started now is not wasted. Reading the new ISO 14001 text and tidying shared procedures pays off under any deadline that eventually appears.
What SANAS and your certification body decide, and the letter to send them
ASC has not verified a SANAS position on ISO 9001:2026 or ISO 14001:2026 and will not state one. SANAS is the South African National Accreditation System, and your certification body is accredited by SANAS or by another recognised accreditation body. Those two organisations, not a consultant, are the ones that will settle your transition dates in writing.
That is an unsatisfying answer and it is the correct one. I would rather tell a client that I do not know than tell them a date I cannot support. Get the answer from the party contractually obliged to give you one, and get it on paper, so it sits in your management review pack rather than in somebody’s memory of a phone call.
- Write to your certification body scheme managerEmail, not a call. Name your certificate numbers, the standards and editions on them, and your next surveillance and recertification dates.
- Ask four questionsHas your accreditation body issued a transition instruction for ISO 14001:2026 or the forthcoming ISO 9001 edition? If yes, what is the document reference and date? From which date will you audit against the new edition, and from which date will you require it? What notice will you give us?
- Ask them to cite, not to summariseRequest the document reference behind the answer. A certification body quoting an accreditation instruction is telling you something verifiable. A certification body quoting a general expectation is not.
- File the reply as a controlled recordAttach it to your management review inputs under external issues and interested party requirements. It is evidence that you monitored the change, which is itself a clause requirement.
- Diarise a re-askSet a reminder to repeat the question each quarter until you have a document reference. Positions will firm up as Global ACI publishes.
ISO 14001 asks what your site uses, stores and discharges, and pest control chemicals count on all three
ASC Pest Control is part of the ASC Food Safety Consultants group, owned and designed by food safety specialists, a SAPCA member with pest control operators registered under Act 36 of 1947, and built around what a BRCGS, FSSC 22000 or R638 audit or inspection actually asks for. Service reports, barcoded device monitoring and trend analysis live in the My ASC Pest Control Hub, so the pest file is audit ready before anyone asks for it. ASC Pest Control serves Gauteng and the Eastern Cape.
Food and beverage pest control by ASC Request a pest control site assessmentWhat a certified site should actually do this quarter
Four things, none of which require a deadline to justify. Get your certification body’s position in writing. Buy the ISO 14001:2026 text from the ISO Store, because you cannot gap read a standard you have not read. Do the gap read against your existing documentation. Then budget a range rather than committing to a transition project on a date that has not been published.
Buying the text is where sites stall, and it is a small amount of money for the only authoritative source in the whole exercise. ISO standards are copyrighted and sold, from the ISO Store, with South African adoptions published by the SABS. This is different from Codex texts, which FAO publishes free, and it is different again from the scheme documents in the ASC standards and certification scheme register, which lists 46 scheme documents and 45 SANS standards so you can see at a glance which of your reference documents are current.
The gap read itself is a two column exercise, not a re-write. New or changed requirement in the left column, the document in your system that currently answers it in the right, and a plain note on whether the existing wording still holds. Most of the rows in an environmental gap read come back as no change needed. The rows that do change tend to cluster in the same place, which is the subject of the next two sections.
The three clauses every ISO transition lands on
Context of the organisation, interested parties, and strategic risks and opportunities are the clauses that carry the most re-writing in any management system revision, and the ones auditors most often raise findings against. Each ASC pack holds a register, a procedure, a completion guide and a read me, in editable Word and Excel.
Context of the Organisation pack, R690 Ask ASC for a quote against your transition scope
Why an integrated management system makes a small ISO change a big project
Most South African food manufacturers do not run ISO 9001 or ISO 14001 on their own. They run one or both alongside FSSC 22000 or BRCGS, sharing a single document control system, one internal audit programme, one corrective action procedure and one management review. A change to one standard therefore reaches procedures that three certification audits look at. That shared layer is the real work.
Think about what a genuinely integrated system holds in common: document and record control, internal audit planning and auditor competence, non-conformance and corrective action with root cause analysis behind it, management review inputs and outputs, training, communication, change management, and in some sites supplier approval. None of those is owned by a single standard, and every one of them is quoted in an environmental clause, a quality clause and a food safety clause at the same time.
The failure mode is predictable. A site updates its environmental procedures for the new ISO 14001 text, the shared internal audit procedure gets a new revision number and clause reference table, and nobody tells the food safety team. Three months later the FSSC 22000 auditor finds an internal audit procedure whose clause map no longer matches the scheme. The environmental change caused a food safety finding.
List every shared procedure once, and mark against each which standards depend on it. That single sheet turns an ISO 14001 revision from a departmental job into a controlled change, and it is exactly the evidence a change management clause expects. If you have never built one, our guide to the 25 most common FSSC 22000 non-conformances shows how often findings come from shared documents drifting out of alignment.
If the shared layer is the problem, replace the shared layer
Where an integrated system has drifted across several revisions and several owners, re-writing procedure by procedure costs more than starting from a consistent, clause mapped set. The ASC FSSC 22000 Category C toolkit holds more than 260 documents, indexed so you can trace a clause to a document and back, and every toolkit includes one hour of premium consultation with one of our consultants.
FSSC 22000 Cat C toolkit, R6,350 Put the question to your certification body with ASC alongside you
The three clauses an ISO transition usually reopens
Every ISO management system standard on the harmonised structure opens with context of the organisation, interested parties and their requirements, and the risks and opportunities that follow from both. Those three are where revisions concentrate, because they are the clauses that carry new themes such as climate into a standard. They are also the clauses South African sites most often answer with a thin paragraph.
See how to build the ISO 22000 clause 4 context and interested party assessments.
Look at what a decent context analysis has to contain for a food factory with an environmental certificate. External issues include the environmental legislation you operate under, municipal water and effluent conditions, electricity supply, waste contractor availability and customer environmental scorecards. Internal issues include plant age, effluent load, refrigerant inventory, packaging formats and the competence of the people who run the utilities. Interested parties include the local authority, your water services provider, your neighbours, your certification body, your customers and your insurers, and each of them has requirements you have to track.
Those registers are also the ones a transition forces you to revisit first, because a new edition changes what the standard expects you to have considered. If you are rebuilding them anyway, build them as living registers rather than as an annual paragraph. ASC sells the three as standalone packs at R690 each, each with a register, a procedure, a completion guide and a read me in editable Word and Excel: Context of the Organisation, Interested Parties and Strategic Risks and Opportunities.
What ISO 14001:2026 means for a South African food factory’s legal register
An environmental management system stands on a legal register, and for a South African food manufacturer that register is long. It carries the environmental instruments that apply to your site, which sit in the ASC South African legislation register of 413 instruments across 42 parent Acts. A revised ISO 14001 is a reason to check that the register is current, complete and evidenced, not just present.
In my audit experience the environmental legal register is the weakest document in most integrated systems. It gets built once during implementation, usually from a template, and then it sits. Meanwhile Extended Producer Responsibility obligations on packaging move, municipal effluent conditions get re-issued with new limits, an air quality licence gets a variation, and the carbon tax position changes for a site that has installed or removed combustion equipment. A register that lists an instrument without recording how compliance is evidenced and when it was last checked is not a compliance evaluation.
Two practical points for food sites specifically. Packaging is where food manufacturers meet Extended Producer Responsibility most directly, and the same packaging decisions sit inside your food safety system as food contact material approvals, so the two systems must agree on what you actually use. Effluent is where a food factory’s environmental risk concentrates, because wash down loads, clean in place chemistry and organic solids all land in the same trade effluent stream that your municipal conditions govern. Both of those are also food safety controls, which is precisely why environmental and food safety documentation cannot be maintained by two teams who never meet.
The ASC South African legislation register lists 413 instruments across 42 parent Acts and is the place to check whether the instrument you cited in your legal register is still the current one. For the food side of the same question, our South African food legislation guide covers the food specific instruments in the same detail.
Two packs that carry most of the environmental evidence
Waste and food loss, and the utilities that produce your effluent, air and steam, are where an environmental auditor and a food safety auditor look at the same equipment for different reasons. Both ASC packs supply a register, a procedure, a completion guide and a read me, and both are editable so they can be pointed at your own municipal conditions.
Waste and Food Loss pack, R690 Utilities, Water, Air, Steam and Lighting, R690 Talk to ASC about running the two systems as one
Does this change ISO 22000, FSSC 22000 or BRCGS?
No. ISO 22000:2018 remains the current edition, confirmed in 2023, with Amendment 1:2024 on climate action. FSSC 22000 Version 7 was published in May 2026 and Global ACI has endorsed it. BRCGS Global Standard Food Safety Issue 9 remains current and Issue 10 has not been released. None of that moves because ISO 9001 or ISO 14001 changes edition.
One point that catches sites out when a quality manager starts reading ISO standards. ISO 22000 alone is not GFSI recognised. GFSI is hosted by The Consumer Goods Forum, it benchmarks schemes and it does not certify anyone, so there is no such thing as GFSI certification, only certification to a GFSI recognised scheme. FSSC 22000 is ISO 22000:2018 plus a sector prerequisite programme standard from the ISO 22002 series plus the FSSC additional requirements, and that combination is what carries recognition. If a customer has asked for GFSI and you hold ISO 22000 by itself, that gap is a bigger commercial problem than the ISO 9001 edition question.
The genuine food safety deadline this year is the FSSC one, and it is published. Version 6 audits are permitted until 30 April 2027, and the Version 7 upgrade audit window runs from 1 May 2027 to 30 April 2028. Ask your certification body to confirm when it must complete the upgrade administration in the FSSC platform, because the certificate depends on that step clearing behind the audit. Our FSSC 22000 Version 7 guide for South Africa and the Version 6 to Version 7 change guide set that out clause by clause. If you have limited change capacity this year, that is where it should go, not into an ISO transition with no date.
Put this year’s change budget where a real deadline sits
The FSSC 22000 Version 7 dates are published and they are the ones that will actually arrive. Train the team properly and the transition stops being a documentation scramble. ASC training is self paced online with lifetime access and a QR verifiable certificate, and no VAT is charged, so the price shown is the price paid.
Implementation of FSSC 22000 V7, R5,500 Transition to FSSC 22000 Version 7, R1,450 Send us your current manual and we will mark up what a transition touches
An ISO transition is mostly a documentation exercise, so stop doing it on paper
ASCloud is the ASC paperless compliance platform: digital checklists, HACCP records and traceability supporting FSSC 22000, BRCGS, HACCP and R638 sites. The printing stops, the evidence sits where an auditor can see it, and where ASC manages your food safety system on the weekly option, your consultant approves the checklists and keeps an eye on the site between visits rather than waiting for the next one. Ask us for a walkthrough on your own checklists.
See ASCloud, the ASC paperless system Ask ASC for an ASCloud walkthroughPrerequisite programmes: ISO 22002 moved on its own timetable
The change people most often confuse with the ISO 9001 and ISO 14001 news is the ISO 22002 prerequisite programme restructure of July 2025. Most parts moved from Technical Specification to full International Standard, including ISO 22002-100:2025, published on 29 July 2025 as a new common baseline, along with parts 1, 2, 4, 5, 6 and 7. ISO/TS 22002-3:2011 for farming is the exception.
Check which ISO 22002 prerequisite standard applies to you now.
That change is dated, published and directly relevant to a food manufacturer, because your prerequisite programme documentation cites these numbers. ISO 22002-1:2025 covers food manufacturing, -2:2025 catering, -4:2025 food packaging manufacturing, -5:2025 transport and storage, -6:2025 feed and animal food and -7:2025 retail and wholesale. If your prerequisite procedures still reference the older technical specification numbering, the citations in your own documents are out of date, and that is a document control observation waiting to be written up.
The confusion happens because both stories are about ISO numbers changing status in the same eighteen month window, and both are being summarised by people who have not read either text. The practical difference is that the ISO 22002 change is published, has a defined content, and touches documents you use every day, while the global ISO 9001 and ISO 14001 transition rules do not exist yet.
Get the prerequisite standard right, because that one has actually changed
If your prerequisite programme documentation still cites the old technical specification numbering, start with the standard itself rather than with a summary. This course works through the ISO 22002-100:2025 requirements as they apply across the food, feed and packaging supply chain, and the toolkit gives you a full ISO 22000:2018 documented system with the current citations already in place.
ISO22002-100:2025 The PRP Standard Requirements, R2,100 ISO 22000:2018 toolkit, R5,900 Ask ASC to scope your ISO transition
How to budget for a transition whose deadline does not exist yet
Budget a range, not a project. Price three things separately: the ISO 14001:2026 text from the ISO Store, the internal hours for a gap read across your shared procedures, and an external allowance for the parts you decide not to do yourself. Approve the first two now and hold the third as a contingency until a transition document is published and your certification body confirms dates.
Splitting it this way protects you from both failure modes. You do not spend a year doing nothing and then meet a deadline that lands in your peak season, and you do not commit a large sum this year against a schedule that turns out to be twice as long as the vendor assumed. The first two line items are useful under every scenario, because a current legal register and an aligned set of shared procedures are worth having on their own merits.
One more thing to put in the plan. Whoever performs your internal audits will need to audit against a text they have read, and internal auditor competence is a clause requirement in every one of these standards. If your internal audit programme is thin, that is a gap the transition will expose regardless of when it starts, and it is the cheapest thing on this list to fix early. Our guide to building internal and supplier auditors covers what competence evidence an auditor expects to see.
For the broader 2026 picture, the standards and scheme changes discussed here sit alongside the Codex changes adopted this year, which reach South African manufacturers through export customers and certification schemes rather than through our own regulations. Our full list of every Codex change from CAC48 and CAC49 is the companion piece to this one.
Fix the internal audit programme while the deadline is still unwritten
An ISO transition is audited by your own people first. If your internal auditors were trained years ago on an edition that has since moved, the transition will surface it as a competence finding. Training them now costs a fraction of closing that finding later, and the same competence serves your quality, environmental and food safety audits at once.
Internal and Supplier Auditing Practices, R3,500 Ask ASC about an integrated management system
Frequently asked questions
Is there a transition deadline for ISO 9001:2026 or ISO 14001:2026?
Is my ISO 9001 or ISO 14001 certificate still valid?
What does ISO stage 60.00 mean for ISO 9001?
What does stage 95.99 mean for ISO 14001:2015?
What is SANAS’s position on the ISO 9001 and ISO 14001 transition?
Can I download the new ISO 14001 text for free?
Does a change to ISO 9001 change ISO 22000 or FSSC 22000?
Is ISO 22000 on its own enough for a customer asking for GFSI certification?
What is the ISO 22002 change that people confuse with the ISO 9001 and ISO 14001 news?
Key takeaways
- ISO 14001:2026, edition 4, was published on 15 April 2026 and ISO 14001:2015 is withdrawn at stage 95.99. The sixth edition of ISO 9001 was scheduled for 16 September 2026 and stood at stage 60.00, not published, on 10 September 2026.
- Global ACI had published no transition document for either standard as at 10 September 2026, so no global transition deadline exists, but UKAS has already required transition to ISO 14001:2026 by 30 April 2029 under its own accreditation. Existing certificates remain valid.
- The International Accreditation Forum ceased operations on 1 January 2026 and Global ACI took over its work, which is why the transition rules that normally follow a revision have not appeared yet.
- ASC has not verified a SANAS position and does not state one. SANAS and your own certification body are the two authorities that will settle your dates, so ask in writing and file the reply.
- In an integrated system the real work is the shared layer: document control, internal audit, corrective action and management review, plus the environmental legal register carrying the environmental instruments that apply to your site.
- The published deadlines this year belong to FSSC 22000 Version 7, and the published change belongs to the ISO 22002 series restructure of July 2025. Start with the Context of the Organisation pack, R690, or the full ISO 22000:2018 toolkit, R5,900, both of which give you the clause 4 documentation a transition touches first.
Send us the certification body’s reply and we will tell you what it actually commits you to
When your certification body answers in writing, the wording matters. ASC will read the reply against your certificate scope and your existing documentation and give you a plain assessment of what changes, what waits, and what you should do anyway. Advisory starts at R480 an hour and a full project is scoped and quoted as one figure.
Browse the ASC toolkits, from R699 Ask ASC for a quote against your transition scope
Published by ASC Food Safety, South African food safety and quality consultants. This article is general guidance and not a substitute for certification-specific advice.