GLOBALG.A.P. published IFA v6.1 Smart on 1 September 2026, but it does not apply to your audit yet. Every v6.1 document carries “Valid from: TBD”, and v6.0 stays the operative version until GLOBALG.A.P. announces the start and replacement dates. If your certification body audits you this season, it audits you against v6.0.
That still leaves work to do now. For fruit and vegetable growers the changes that matter most are in water, where a mandatory decision tree now sets the minimum for microbial analysis of preharvest water. One soil fumigation criterion moves from Minor Must to Major Must, which makes it a criterion you cannot afford to fail. Producer groups, sampling and audit cycles also change in the General Regulations.
South African growers selling to export markets and local retailers will meet v6.1 at their first audit after the start date, and harvest calendars here do not wait for announcements. Read this alongside your current checklist, and if you would rather have the documents in hand before the dates are set, our GLOBALG.A.P. IFA v6 toolkit starts at R5,950.
In short
- IFA v6.1 Smart was published on 1 September 2026. Start and replacement dates are still to be announced, so v6.0 is what you are audited against today.
- Microbial analysis of preharvest water now follows a mandatory decision tree in Annex I of the fruit and vegetables P&Cs.
- FV-Smart 28.02.02, the preplanting interval after soil fumigation, moves from Minor Must to Major Must.
- A producer group must have three or more producers, every annual audit now uses the full checklist, and recertification samples may drop to 80 percent of the square root when the previous monitoring audit was clean.
IFA v6.1 Smart is published but has no start date yet
The cover of each v6.1 document reads “English interim final version 6.1_Sep26”, published on 1 September 2026, valid from TBD, replacing version 6.0 as of TBD. GLOBALG.A.P.’s technical news for IFA says those dates will be communicated in due course. It also confirms that certification bodies and auditors approved for v6.0 Smart are approved for v6.1 automatically, without extra training. GLOBALG.A.P. is now owned by Agraya GmbH, the company named on the new documents.
Our earlier guide to what was new in IFA v6 covers the version this one builds on, and how to get GLOBALG.A.P. certification covers the process. Treat the gap as preparation time. A minor version is still a version change, and auditors tend to pick up new wording quickly once it applies.
The GFS edition, the one with GFSI recognition, follows a different track. IFA v6.1 GFS has gone into GFSI re-benchmarking and will not be released publicly until recognition is obtained. If your customer asks for GFS, carry on with IFA v6 GFS and watch for the transition notice. Customer requirements usually decide which edition you need, so check your programme agreement before you assume either way.
Preharvest water now follows a mandatory decision tree
Water is where many South African growers are exposed, because so many farms draw from rivers, dams and canals they do not control. In v6.1, FV-Smart 30.05.01 says the frequency of preharvest microbial water analysis shall be based on the outcome of the mandatory decision tree in Annex I. The wording of the water risk assessment in 30.01.01, and of 30.05.02 to 30.05.04, has also been clarified. In v6.0 the rule was simpler and blunter: water analysis at least once a year.
The decision tree asks two questions. Is the crop always cooked before it is eaten? Does the water touch the harvestable part of the crop? The outcomes are set out below, as they read in the v6.1 fruit and vegetables P&Cs.
| Your situation | Minimum microbial analysis of preharvest water |
|---|---|
| Product is always cooked before eating | No minimum frequency set by the tree |
| Not always cooked, and water does not touch the harvestable part | No minimum frequency set by the tree |
| Not always cooked, and water touches the harvestable part | Frequency set by your water risk assessment, at least one microbial analysis per season or certificate validity period |
Until v6.1 applies, v6.0 still requires water analysis at least once a year, so do not drop any test yet.
“No minimum frequency” does not mean no water risk assessment. The assessment in 30.01.01 still has to cover every water source and use, and unacceptable results still demand corrective action. Water used at harvest and after harvest that touches the product, ice included, must meet the microbial standard for drinking water (in South Africa the usual reference is SANS 241) and be analysed at least once per season or certificate validity period. Our earlier post on the GLOBALG.A.P. water risk assessment in South Africa walks through building that assessment from scratch.
A worked example from a Limpopo tomato farm
Take a tomato grower near Tzaneen supplying fresh market tomatoes. Tomatoes are often eaten raw, so the first branch of the tree does not apply. Irrigation is by drip from a borehole, and drip water does not touch the fruit. For that use, the tree sets no minimum.
The same farm mixes foliar sprays with water from a farm dam. That spray lands on the fruit, so for this use the water touches the harvestable part. The water risk assessment now sets the frequency, with at least one microbial analysis per season, usually for generic E. coli as the faecal indicator. If the dam takes runoff from a neighbouring cattle camp, the assessment should push that higher, perhaps before each spray programme in the weeks before harvest.
In the packhouse, tomatoes go through a dump tank. That is postharvest water in contact with the product, so it must meet the drinking water microbial standard and be analysed at least once per season or certificate validity period. The seasonal test does not control the tank. Because the water is recirculated, the farm needs a written change frequency based on pH, sanitiser strength and turbidity (30.05.05), and if chlorine is dosed, documented monitoring against set limits, at a frequency set by your risk assessment, with corrective action when a reading is out (30.05.06). Both are Major Musts.
Each water use on the same farm gets its own answer, and an auditor will now expect that reasoning written down. Our GLOBALG.A.P. IFA v6 toolkit includes a water risk assessment template you can mark up with each use and its decision tree outcome, for R5,950.
Soil fumigation becomes a Major Must
FV-Smart 28.02.02 requires that the preplanting interval after soil fumigation is complied with. In v6.0 it was a Minor Must. In v6.1 it is a Major Must, and a Major Must must be met in full for certification. Growers who fumigate before planting potatoes, tomatoes or strawberries should check that every fumigation record shows the target problem, the field, the active ingredient and dose, the method, the operator, the date applied and the planting date, and that the gap is at least the preplanting interval on the label. Fumigants stay in the soil air as phytotoxic gas until they break down or escape, and cold, wet or heavy soils hold them longer. Methyl bromide remains banned as a soil fumigant under 28.02.01.
This sits naturally with your crop protection records. If you export, our post on Codex pesticide MRL revocations for exporters covers the residue side.
Two criteria are merged, and one gets stricter
Two v6.0 criteria no longer stand alone. FV-Smart 25.07, on removing fragments and small pieces of packaging from the field, has been folded into 21.04. FV-Smart 32.02.02, on recording weather conditions at the time of application, is now a line in 32.02.01, which lists “Local weather conditions for noncovered crops” among the application records. The weather item stays a Major Must. Field fragments are the bigger change: they were a Minor Must under 25.07 and now sit in 21.04, a Major Must, so packaging left in a block can stop certification. The old numbers 25.07 and 32.02.02 are reused for other criteria, so check cross references by wording rather than by number.
If your procedures, checklists or software cross-reference P&C numbers, plan an update for when v6.1 applies. Farms that keep records in ASCloud can attach evidence to the new numbers rather than reprinting files. Our post on paperless records for IFA v6 farms explains how that works on a farm.
What changes for producer groups and certification bodies
The General Regulations have been split into separate sets, and the GFS additions inside them have gone. For Option 2 producer groups, the v6.1 quality management system rules now state that the group shall consist of three or more producers.
The three-year cycle that let certification bodies audit only operational items in years two and three has been deleted, as the certification body rules record. Under v6.1 every annual audit uses the complete checklist, so expect a fuller audit each year. “Surveillance audit” is now called “monitoring audit”. The change most groups will feel is sampling at recertification. If the previous certification body monitoring audit found no non-conformities, and the audit of the quality management system raises no doubts about how well it works, the sample may be reduced to 80 percent of the square root of members or sites.
For a group of 64 members in the Eastern Cape citrus belt, the square root is eight. Eighty percent of eight is 6.4. The regulations round the square root up but do not say how to round the reduced figure, so expect your certification body to audit seven and confirm it with them. The reduction is earned by a clean monitoring audit, which makes a strong internal inspection programme worth more than it was.
What to do before the dates are announced
- Run every water use on the farm and in the packhouse through the Annex I decision tree, and write the outcome into your water risk assessment.
- Keep your v6.0 annual water analysis going, and book microbial analysis for any use where water touches the harvestable part.
- Pull your soil fumigation records and check each preplanting interval against the product label.
- If you run a producer group, check your membership count, your internal inspection evidence and whether the last monitoring audit was clean.
- Mark the merged criteria and the new numbering in your checklists, so the change is a quick edit when v6.1 applies.
If you would rather have this done with you, our GLOBALG.A.P. implementation consulting covers growers and packhouses across the country.
Why food businesses choose ASC
Rated 4.9 out of 5 from more than 400 Google reviews across our three offices.
Gqeberha Google reviews Johannesburg Google reviews Cape Town Google reviews
Our online courses hold a 4.9 average from 2,655 course reviews and more than 7,200 course enrolments.
ASC is ISO 9001 certified, a SAATCA registered online training course provider (TC 065), FoodBev SETA Accredited Provider No. 587/00337/1900 and an Exemplar Global Recognised Training Provider.
Get audit ready for IFA v6
GLOBALG.A.P. IFA Version 6 Document Templates Toolkit
Editable Word and Excel procedures, forms and risk assessments for IFA v6, delivered by email after payment. You still complete them for your own farm, and the toolkit does not certify you. Use the changes in this post to mark up your copy for v6.1. Fail a Major Must such as 28.02.02 and there is no certificate until it is closed, which for an exporter can mean a season of fruit with nowhere to go. Versions with SPRING (R6,840), Tesco Nurture (R6,450), LEAF Marque (R7,500) or all add-ons (R8,720) are on the toolkit page. R5,950 without add-ons.
Get the IFA v6 toolkit WhatsApp us about your farm
Want it done with you? Free, no obligation quote. Consulting is charged hourly. GLOBALG.A.P. implementation consulting.
Training a farm manager or compliance officer? Implementation of GLOBALG.A.P. IFA V6 for Plants course (R4,200).
Questions we are often asked
When does GLOBALG.A.P. IFA v6.1 become mandatory?
Not yet. The v6.1 Smart documents were published on 1 September 2026 with valid from and replacement dates marked “TBD”. GLOBALG.A.P. says the dates will be communicated in due course, and v6.0 remains the operative version until then.
How often must we test irrigation water under v6.1?
It depends on the Annex I decision tree. Where the crop is not always cooked and the water touches the harvestable part, your water risk assessment sets the frequency, with at least one microbial analysis per season or certificate validity period. Harvest and postharvest water that touches the product must meet the microbial standard for drinking water and be analysed at least once per season or certificate validity period. Until v6.1 applies, keep to the v6.0 rule of at least one analysis a year.
How many members does a GLOBALG.A.P. producer group need?
The v6.1 quality management system rules say the group shall consist of three or more producers.
Sources
- GLOBALG.A.P. IFA v6.1 Smart fruit and vegetables principles and criteria, interim final version, 1 September 2026
- GLOBALG.A.P. General Regulations, rules for the quality management system v6.1
- GLOBALG.A.P. General Regulations, rules for certification bodies v6.1
- GLOBALG.A.P. Technical news for IFA, checked 12 November 2026

