A GMP audit checklist for a food factory covers the prerequisite programmes that HACCP takes for granted: the building and its services, equipment, cleaning, pest control, people, materials coming in and product going out. The auditor walks each area while the line runs, grades every finding by its consequence and agrees the evidence that will close it.
The published basis for a food manufacturer is now ISO 22002-100:2025 read with ISO 22002-1:2025, beside Codex CXC 1-1969, revised 2022. In South Africa R638 sets the hygiene requirements for your premises. FSSC 22000 brings the 2025 parts in with Version 7, audited from 1 May 2027. Until then a Version 6 audit still uses ISO/TS 22002-1:2009, so we audit to the 2025 parts and note any line where the two differ.
The checklist that follows is the one we work from as SAATCA registered auditors, with a typical finding in each area and the evidence that closes it. Then comes a worked example from a Johannesburg meat processor audited three weeks before the December shutdown. If you would rather have us walk your site, book an ASC good manufacturing practice audit.
In short
- ISO/TS 22002-1:2009 is withdrawn. The new basis is ISO 22002-100:2025 together with ISO 22002-1:2025, both published in July 2025. FSSC 22000 sites audited to Version 6 before 1 May 2027 are still assessed against the 2009 text.
- Codex CXC 1-1969 says HACCP will not be effective without prerequisite programmes in place first. A GMP audit tests that foundation.
- Audit with the line running. Grade findings by consequence rather than counting ticks.
- A finding is closed by evidence that the fix held under production, not by a signature on the action list.
- Late November suits the audit well. Quick fixes close before the break, and fabric repairs go into the shutdown maintenance plan.
GMP audit, gap audit and certification audit are different jobs
A GMP audit assesses the operating conditions of a site against a declared basis. It ends in a report with section scores and a risk ranked action list, not a certificate.
A gap audit measures how far you sit from a standard you do not yet hold, such as BRCGS or FSSC 22000, and gives a sequenced register of work. A certification audit is the accredited certification body’s own audit, and it leads to the certification decision. ASC is not a certification body.
First party means your own internal food safety audit, run on a risk based schedule. Second party is a customer checking its supplier, as in a supplier audit. Third party is the certification body. A GMP audit you commission from us is independent, and the report belongs to you.
FSSC 22000 sites already have a GMP check built in. Version 7 requirement 2.5.12 asks for routine site inspections or PRP checks, giving monthly as the example, with frequency based on risk. An external GMP audit is the independent version of that check.
The basis an auditor should print on the front of the report
Part 100 holds the requirements common to the whole supply chain, and ISO 22002-1:2025 applies in conjunction with it for food manufacturing. The other 2025 sector parts cover catering, packaging manufacturing, transport and storage, feed, and retail and wholesale. Farming stays on ISO/TS 22002-3:2011. FSSC 22000 Version 7 names Part 100 and Part 1 for every food manufacturing subcategory, and our guide to ISO 22002-100:2025 maps where the old clauses went.
Codex covers the same ground in its first part, good hygiene practices, and BRCGS Food Safety Issue 9 in section 4, site standards. Most GMP checklists online are free downloads mapped to no published requirement, so their score measures nothing in particular.
The GMP audit checklist, area by area
The checklist comes in two tables: where the auditor looks, then a typical finding and the evidence we accept as closure. Closure always includes records from normal production, because a fix seen only on audit day proves nothing yet.
| Area | What the auditor looks at |
|---|---|
| Site and grounds | Perimeter drainage, vegetation against walls, the refuse yard, dock doors |
| Building fabric | Floors, coving, walls, ceilings, overheads above open product |
| Layout and zoning | Movement of product, people, waste and air between raw and cooked areas, drain direction |
| Utilities: water, ice, air, steam | Water testing, backflow protection, non potable lines marked, compressed air filtration |
| Waste | Lidded, identified containers, removal frequency, waste routes |
| Equipment and hygienic design | Cleanability, dead legs, temporary repairs, hygiene release after maintenance |
| Cleaning and sanitation | Chemical, dilution, temperature and contact time in the instruction, with swab or ATP verification |
| Environmental monitoring | Swab plan by zone, target organisms, trend review, action on positives |
| Pest control | Contract, site plan, trend reports, open contractor recommendations |
| Personnel hygiene and facilities | Hand wash stations, changing sequence, laundering, jewellery, illness reporting |
| Rework | What may be reworked into what, the maximum rate and age, cooked never into raw, labelling, allergen and traceability links |
| Purchasing and supplier control | Approved suppliers, specifications, certificates, services such as laundry |
| Storage and transport | Chiller temperatures and alarms, stock rotation, vehicle checks at dispatch |
| Allergen and foreign body controls | Allergen register, changeover clean validation, metal detection, sieves, knife control |
| Glass and brittle plastics | Register against the room, inspection frequency, breakage procedure |
| Product information | Labels, allergen declarations, lot codes, label control at changeover |
| Area | Typical finding | Evidence that closes it |
|---|---|---|
| Site and grounds | Pallets stacked against the wall by the dock, giving rodents cover | Cleared strip, yard on the weekly inspection, two weeks of checks |
| Building fabric | Flaking paint and condensation over an open line | Repair with hygiene clearance, condensation fixed at source |
| Layout and zoning | Staff crossing to the cooked side without changing | Signed zone map, a changing point at the crossing, observations on both shifts |
| Utilities: water, ice, air, steam | No water result on file for the ice machine | Sampling plan by point, results within specification |
| Waste | Waste leaving through the door packaging enters | Separate route or time written into the procedure and observed |
| Equipment and hygienic design | Cable ties holding a guard over an open conveyor | Permanent repair, a written ban on temporary fixes, clearance record per job |
| Cleaning and sanitation | Sanitiser strength never checked, swab limits never failed | Strength log, limits per surface, action taken on the next failure |
| Environmental monitoring | Listeria swabs taken only from easy surfaces, never drains or under equipment | Zoned swab map, results trended monthly, repeat positives traced to source |
| Pest control | One recommendation repeated for three months | Recommendations closed with photographs, trends reviewed monthly |
| Personnel hygiene and facilities | No soap at the packing basin on night shift | Supplies on the shift start checklist, an unannounced spot check |
| Rework | Trimmings added to the next day’s batch with no record | Rework log tied to batch codes, a traceability test that includes rework |
| Purchasing and supplier control | Casings bought from an unapproved supplier | Supplier approved or replaced, receiving staff told what to reject |
| Storage and transport | Chiller alarm with nobody named to respond at night | Tested call out list and alarm response record |
| Allergen and foreign body controls | Metal detector tests missed on night shift | Test schedule for every shift, failed test procedure, daily review |
| Glass and brittle plastics | Cracked light diffuser missing from the register | Diffuser replaced, register reconciled room by room |
| Product information | Wrong label roll left at the line after changeover | Label reconciliation and signed line clearance at each changeover |
Three rows tend to produce the serious findings. Zoning faults are built into the layout, so they repeat every shift. A temporary repair on equipment often becomes the contamination source. A glass register drifts away from what is actually in the room, and our glass breakage procedure covers both the register and the response to a breakage. Smaller premises should also read our common hygiene audit findings.
Codex is specific where it matters. Drainage should not flow from raw production areas to where finished food is exposed (section 9.2.1), and records should be kept for longer than the product’s shelf life.
How to grade and score the findings
Grade every finding by what it could do to the product. Our three grades follow the same logic as the FSSC 22000 grades, so you can read our report the way a certification body auditor would. The certification body still makes its own grading on the day.
| Grade | When it applies | What happens next |
|---|---|---|
| Critical | Direct risk to safety or legality with no adequate action seen | Product held or the activity stopped before the auditor leaves |
| Major | A programme is not controlling what it should, or the law is not met | Correction within days, corrective action verified within four weeks |
| Minor | A lapse that does not stop the programme working | Correction now, corrective action checked at the next audit |
Under FSSC 22000 Version 7, audited from 1 May 2027, a major nonconformity must be closed by the certification body within 28 calendar days of the last audit day, or covered within that time by temporary controls it accepts while a longer fix is completed. A critical at a certified site suspends the certificate within 3 working days, and at an initial audit it fails the audit. Hold your GMP findings to the same deadlines.
Scoring is for comparison over time, not a pass mark. Score each section against the lines that apply, weight sections by risk and write the weighting down. Keep the basis fixed so the next audit measures real movement.
Closing a finding so it stays closed
Replacing a cracked diffuser is the correction. Changing the inspection so the register cannot miss it again is the corrective action. Closure needs both, with proof.
- Make the correction and photograph it with the date.
- Ask why the control failed, not who failed it, until you reach something you can change.
- Change the procedure, equipment or training to remove that cause, with an owner and a date.
- Collect two to four weeks of records from normal production showing the change held.
- Have someone other than the owner verify it.
If the fix needs money or a builder, record a temporary control that keeps product safe until the permanent fix is done. The report arrives about a week after the audit, so for findings in hand before the December shutdown, ask for a date now. Request a GMP audit quote or WhatsApp us with what you make.
Worked example: a Johannesburg meat processor before the December shutdown
This is an illustrative composite, not a client. A processor in the south of Johannesburg runs two shifts, making raw boerewors in one hall and cooked polony and viennas in another. It is FSSC 22000 certified, with a Version 6 recertification audit due in March 2027. The GMP audit runs on Tuesday 24 November 2026 with both lines running, and the report arrives on 1 December.
The audit raises one critical, three majors and eight minors. Layout and zoning scores 58 per cent and carries triple weight because raw and cooked product share one building. Cleaning scores 64 per cent and personnel hygiene 86. Last production is 17 December, and the lines restart on 6 January 2027.
| Grade | Finding | Closure and evidence |
|---|---|---|
| Critical | A drain channel from the raw mincing room runs into a gully in the cooked hall (Codex section 9.2.1) | Gully blanked off and the area swabbed on 24 November, before the auditor left. Channel sealed and raw effluent rerouted on 30 November, drain rebuild booked for 21 December. Evidence: photographs, job card, Listeria swabs of cooked hall drains and nearby surfaces after the rebuild and in the restart week |
| Major | Night shift skipped metal detector tests on two nights | Retraining on 26 November and a supervisor signature at every test. Evidence: two weeks of signed records and a failed test drill |
| Major | Knife sterilisers on the raw line below the temperature in the site’s own procedure | Element replaced on 25 November and a check at each shift start. Evidence: readings for every shift, probe calibration certificate |
| Major | Casings bought from a supplier missing from the approved list | Supplier approved on 4 December, specification on file. Evidence: approval record and receiving checks |
| Minor (8) | Glass register gaps, an open pest recommendation, no soap at one basin, one rework entry missing a batch code that was traced from the production plan, and four more | Seven closed by 11 December. The spice room condensation carries into January under a temporary control. Evidence: updated registers and photographs filed against each action line |
That drain is the finding that matters most. South Africa’s 2017 to 2018 listeriosis outbreak, the largest ever documented, with 1,060 cases and 216 deaths, was traced to ready to eat processed meat, and raw to cooked separation is where Listeria monocytogenes gets in.
Breaking open a drain in a cooked area can release Listeria that has lived in it for years, so the cooked hall gets a full clean after the builders leave and extra swabs before polony goes back on the line. Our guide to Listeria in ready to eat food covers the swab plan.
The shutdown makes the timing work. The drain rebuild and the spice room extraction need contractors and dry floors, so they go into the shutdown maintenance plan, with section 37(2) agreements signed for the contractors. A verification visit in the first production week then confirms the fixes held, in line with our checklist for restarting after the December shutdown.
Why food businesses choose ASC
Rated 4.9 out of 5 from more than 400 Google reviews across our three offices.
Gqeberha Google reviews Johannesburg Google reviews Cape Town Google reviews
Our online courses hold a 4.9 average from more than 2,600 course reviews and more than 7,200 course enrolments.
ISO 9001 certified. SAATCA registered online training course provider (TC 065). FoodBev SETA Accredited Provider No. 587/00337/1900. Exemplar Global Recognised Training Provider.
Book the audit your customer would do
An ASC good manufacturing practice audit
One day on site while your lines run, then a written report about a week later with findings area by area, section scores and a risk ranked action list. SAATCA registered auditors do the work, led by a registered lead auditor with Exemplar Global and IRCA. ASC is not a certification body. Free, no obligation quote. Consulting is charged hourly, and the audit is quoted on scope. Set it against a major at your certification audit, or a lost customer listing.
Request a GMP audit quote WhatsApp us
Writing your prerequisite programmes yourself? HACCP (SANS 10330) and PRPs (SANS 10049) Document Templates Toolkit (122 editable documents for R5,500 once off, with a one hour support consultation).
Training the supervisors who own the programmes? Implementation of Good Manufacturing Practices course (online, R1,950 a person).
Questions we are often asked
Do we get a GMP certificate after the audit?
No. You receive a report with section scores and a risk ranked action list to show your customers. No accredited GMP certification scheme exists behind a consultant’s report, so treat any offer of a GMP certificate with care.
Which standard is a GMP audit done against?
For a food manufacturer, ISO 22002-100:2025 read with ISO 22002-1:2025 and Codex CXC 1-1969, plus the hygiene law for your premises and any scheme or customer standard you hold. An FSSC 22000 Version 6 audit before 1 May 2027 still uses ISO/TS 22002-1:2009.
How often should a factory have a GMP audit?
Your own PRP checks should run on a risk based schedule, and FSSC 22000 Version 7 gives monthly as the example. An independent GMP audit is worth booking at least once a year, and before a certification or customer audit.
Sources
- ISO, ISO 22002-100:2025, Part 100: Requirements for the food, feed and packaging supply chain, July 2025
- ISO, ISO 22002-1:2025, Part 1: Food manufacturing, July 2025
- ISO, ISO/TS 22002-1:2009, withdrawn
- FAO and WHO, General Principles of Food Hygiene, CXC 1-1969, revised 2022, 2023 edition, principle ii, sections 9.2.1, 13.2.5, 13.4, 18.1
- Foundation FSSC, FSSC 22000 Scheme Version 7.0, May 2026, Part 1 Table 1, Part 2 sections 2.4 and 2.5.12, Part 3 section 6.2
- BRCGS, Global Standard Food Safety Issue 9, 1 August 2022, Part II section 4
- WHO Regional Office for Africa, WHO congratulates South Africa on the end of the world’s largest listeriosis outbreak, 4 September 2018